Road Construction – Larry Uteck Boulevard at Southgate Drive

Posted:

EN
FR

Le texte en français suit

Location: Intersection of Larry Uteck Boulevard at Southgate Drive

Date: Tuesday, November 1 from 9 a.m. to 1 p.m.

Work details: The work is for paving at the intersection. This project supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: During this work, the traffic signals will be shut down and traffic control personnel will be in place to direct traffic and pedestrians. Motorists should expect delays and are asked to use alternative routes whenever possible. 

*****************************************

Travaux de construction routière – Boulevard Larry Uteck à la promenade Southgate

Emplacement : Intersection du boulevard Larry Uteck et de la promenade Southgate

Date : Le mardi 1er novembre de 9 h à 13 h

Détails des travaux : Les travaux visent à revêtir l’intersection. Ce projet appuie le Plan des priorités stratégiques du Conseil régional de 2021-2025 visant à établir un réseau de mobilité intégré qui est sécuritaire et accessible.

Impact sur la circulation : Au cours des travaux, les feux de circulation seront hors service et le personnel de contrôle de la circulation sera sur place pour diriger la circulation et les piétons. Les automobilistes doivent s’attendre à des ralentissements et on leur demande d’emprunter d’autres itinéraires dans la mesure du possible.