Posted:
Location: Beaver Bank Road between Glendale Drive and Gloria Avenue
Date: Friday, July 30
Time: 9 a.m. to 4 p.m.
Work details: This work is to accommodate the collection of groundwater samples.
Traffic impact: Two-way traffic will be maintained while work is underway. Motorists should expect delays and are asked to use alternative routes whenever possible.
Construction during COVID-19: Construction crews will strive to maintain physical distancing measures, however, residents may see workers within two metres of each other while completing certain tasks which aligns with the exemptions outlined in the Provincial Health Order. If approaching construction crews, residents are asked to maintain at least two metres of physical distancing.
**********************
Lieu : Chemin Beaver Bank entre Promenade Glendale et Avenue Gloria
Date : Le vendredi 30 juillet 2021
Heure : De 9 h à 16 h
Détails du travail : Ce travail vise à permettre la collecte d’échantillons d’eau souterraine.
Impact sur la circulation : La circulation dans les deux sens sera maintenue pendant les travaux. Les automobilistes doivent s’attendre à des retards et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.
Construction pendant la COVID-19 : Les équipes de construction s’efforceront de maintenir des mesures d’éloignement physique; cependant, les résidents peuvent voir des travailleurs à moins de deux mètres les uns des autres alors qu’ils effectuent certaines tâches, ce qui est conforme aux exemptions prévues par l’arrêté provincial sur la santé. S’ils s’approchent des équipes de construction, les résidents sont priés de garder au moins deux mètres de distance.