Posted:
Le texte en français suit.
Location: Gottingen Street, between Cogswell Street and Portland Place
Date: Saturday, September 30 and Monday, October 2
Time: 7 a.m. until 7 p.m.
Work details: This work is for the installation of a gas main, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.
Traffic impact: Gottingen Street will be fully closed to traffic between Cogswell Street and Portland Place while work is underway. A signed detour will be in place, and the sidewalk on the east side of the work site will remain open. Motorists should expect delays and are advised to use alternative routes whenever possible.
***************************************************************
Fermeture de route – rue Gottingen
Lieu : Rue Gottingen, entre la rue Cogswell et Portland Place
Date : Le samedi 30 septembre et le lundi 2 octobre
Heure : de 7 h à 19 h.
Détails du travail : Ces travaux visent l’installation d’une conduite de gaz, qui appuie le plan des priorités stratégiques 2021-25 du Conseil régional visant à établir un réseau de mobilité intégré sécuritaire et accessible.
Impact sur le trafic : La rue Gottingen sera entièrement fermée à la circulation entre la rue Cogswell et Portland Place durant les travaux. Une déviation signalée sera mise en place et le trottoir du côté est du chantier restera ouvert. Les automobilistes doivent s’attendre à des retards et il leur est conseillé d’emprunter des itinéraires alternatifs dans la mesure du possible.