Traffic Delay – Princess Margaret Boulevard

Posted:

EN
FR

​​​​​​Le texte en français suit.

UPDATE: This work will continue until Friday, Nov. 22

Location: Princess Margaret Boulevard, from Windmill Road to Highway 111 Halifax bound on ramp

Date: Monday, Nov. 4 to Monday, Nov. 18 Friday, Nov. 22

Time: 9 a.m. to 4 p.m.

Work details: This work includes sidewalk and asphalt repair, in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop-and-go traffic will be in place while work is underway. Traffic personnel will be in place to guide motorists through the work area. Motorists should expect delays and are advised to use alternative routes whenever possible. 

********************************************************************************************************************

MISE À JOUR : Ces travaux se poursuivront jusqu'au vendredi 22 novembre.

Ralentissement de la circulation – Boulevard Princess Margaret

Lieu : Princess Margaret Boulevard, du chemin Windmill à la bretelle d’accès à Halifax de l’autoroute 111

Date : Du lundi 4 novembre au lundi 18 novembre vendredi 22 novembre.

Heure : De 9 h à 16 h

Détails des travaux : Ces travaux visent à faciliter la réparation des trottoirs et de l’asphalte, qui appuient le Plan des priorités stratégiques du Conseil régional de 2021-2025 visant à établir un réseau de mobilité intégré, sécuritaire et accessible.

Impact sur la circulation : La circulation sera intermittente durant les travaux. Du personnel du contrôle de la circulation sera sur place pour guider les automobilistes à travers la zone de travaux. Les automobilistes doivent s’attendre à des retards et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.