Bus Stop Construction

2024/2025 Bus Stop Construction

A list of current plans for bus stop construction, adjustments and improvements by district. To look up your district, enter your street address into our District Look-up tool. If you have any questions, or to report any issues (i.e., drainage or sewer lateral issues) please contact 311.

Please note: If your district is not listed, there is no construction planned for 2024/2025.

Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Hwy 7 Before Circle Dr (8918) 3293 Hwy 7 North side of Hwy 7 abutting Civic 3293 Widen gravel shoulder, new asphalt pad Completed October 2024
Hwy 7 Before Martin Lake Dr (8920) 3103 Hwy 7 West side of Hwy 7 abutting Civic 3103 Widen gravel shoulder, new asphalt pad Completed October 2024
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Caldwell Rd After Birchill Dr (2218) 1720 Birchill Dr Northeast side of Caldwell Rd abutting Civic 1720 Birchill Dr New concrete landing pad and sidewalk connection to Birchill Dr Pending 2025 construction
Caldwell Rd after Cow Bay Rd (6333) Opposite to 1804 Caldwell Rd West side of Caldwell Rd near the cemetery Upgrading shelter pad Completed September 2024
Caldwell Rd After Himmelman Dr (6334) 49 Sidney Cr West side of Caldwell Rd after Himmelman Dr abutting Civic 49 Sidney Cr Upgrading bus pad length Completed September 2024
Caldwell Rd After Thorncrest Ct (6337) 1881 Caldwell Rd West side of Caldwell Rd near the elementary school Upgrading shelter pad Completed September 2024
Caldwell Rd Before Deyoung Dr (2220) 1622 Caldwell Rd Northeast side of Caldwell Rd abutting Civic 1622 New concrete landing pad and sidewalk connection to Deyoung Dr Pending 2025 construction
Caldwell Rd Before Seabreeze Dr (6340) 1909 Caldwell Rd Southwest side of Caldwell Rd near Ocean View Continuing Care Centre Upgrading shelter pad Completed September 2024
Caldwell Rd Opposite Kaleigh Dr (2219) 1682 Caldwell Rd Northeast side of Caldwell Rd abutting Civic 1682 Concrete landing pad with sidewalk connection to Kaleigh Dr Pending 2025 construction
Collins Grv After Spring Ave (2267) 103 Collins Grv West side of Collins Grv adjacent to Civic 103 Collins Grv New concrete pad between curb and sidewalk Completed July 2024
Collins Grv At Civic 83 (2268) 83 Collins Grv West side of Collins Grv abutting Civic 83 New concrete pad between curb and sidewalk Completed July 2024
Cow Bay Rd Before Caldwell Rd (8674) 386 Cow Bay Rd Northwest side of Cow Bay Rd abutting Civic 386 Concrete landing pad and sidewalk connection to Caldwell Rd intersection Construction started November 2024
Gregory Dr Before Wildwood Blvd (6794) Opposite to 14 Gregory Dr North side of Gregory Dr opposite to Civic 14 New concrete pad, sidewalk, and new shelter pad Completed August 2024
Heritage Hills Dr Before Cow Bay Rd (8673) 4 Heritage Hills Dr Northeast side of Heritage Hills Dr abutting Civic 4 Concrete landing pad and sidewalk connection to Cow Bay Rd Construction started September 2024
Heritage Hills Dr Before Serop Cr (8672) 1 Serop Cr Northeast side of Heritage Hills Dr adjacent Civic 1 Serop Cr Concrete landing pad and sidewalk connection to Serop Cr Completed November 2024
Main Rd After Howard Ave (8012) 1095 Main Rd West side of Main Rd near Civic 1095 Slight relocation of bus stop, new concrete pad between curb and sidewalk Completed July 2024
Main Rd Before Bonaventure St (7486) 2 Hines Rd Northeast side of Main Rd near Bonaventure St Shelter replacement Completed January 2024
Portland Hills Terminal Bay 8 (8957) 866 Portland St Portland Hills Terminal Shelter replacement Completed September 2024
Windward Ave After Lucien Dr (2262) 37 Windward Ave North side of Windward Ave New concrete pad between curb and sidewalk Completed September 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Brooks Dr At East Preston Rec Centre (8929) 24 Brooks Dr West side of Brooks Dr abutting Civic 24 Relocation to other side of driveway, new concrete pad, connection to multi-use path Construction started August 2024
Brooks Dr Opposite East Preston Rec Centre (8769) 11 Brooks Dr East side of Brooks Dr abutting Civic 11 Slight relocation, new elongated concrete pad with pedestrian ramp to access multi-use path on opposite side of street Construction started August 2024
Circassion Dr After Ellerslie Cr (2307) 62 Circassion Cr West side of Circassion Dr abutting Civic 62 Relocation of Stop Circassion Dr Before Ellerslie (6425) after Ellerslie Cr, new concrete pad between curb and sidewalk Completed August 2024
Circassion Dr Before Ellerslie (6425) 80 Circassion Cr West side of Circassion Dr abutting Civic 80 Removal of stop, concrete removal, and grass reinstatement Stop is closed permanently
Cole Harbour Rd After Otago Dr (6478) 915 Cole Harbour Rd North side of Cole Harbour Rd abutting Civic 915 Concrete bus pad repair Completed August 2024
Cole Harbour Rd At Civic 1722 (2343) 1722 Cole Harbour Rd Northeast side of cole Harbour Rd near civic 1722 New bus stop created Bus stop is open, as of November 18, 2024
Cole Harbour Rd Before Dorothea Dr (6481) 907 Cole Harbour Rd North side of Cole Harbour Rd opposite Civic 912 Shelter replacement Completed May 2024
Cole Harbour Rd Opposite to Pacific Ave (2342) 1697 Cole Harbour Rd West side of Cole Harbour Rd near Civic 1697 New bus stop created Bus stop is open, as of November 18, 2024
Flying Cloud Dr Before Gregory Dr (2324) 204 Flying Cloud Dr West side of Flying Cloud Dr New bus stop, new concrete pad and sidewalk Completed August 2024
Forest Hills Pky At Cole Harbour Place (6669) 51 Forest Hills Pky East side of Forest Hills Pky abutting Civic 51 New shelter Completed March 2024
Gregory Dr After Flying Cloud Dr (6792) 7 Gregory Dr North side of Gregory Dr abutting Gregory Dr Park Removal of shelter and old pad, relocation of bus stop to Civic 204 Flying Cloud Dr Completed August 2024
Hwy 7 After Civic 1776 (8767) 1776 Hwy 7 East side of Hwy 7 after the Old Preston Rd intersection Relocation at the location of work Construction started September 2024
Hwy 7 After Glasgow Rd (2340) 1900 Hwy 7 South side of Hwy 7 abutting Civic 1900 New stop with concrete pad, new concrete sidewalk Construction started September 2024
Hwy 7 After Old Preston Rd (2339) Opposite to Civic 1799 East side of Hwy 7 after the Old Preston Rd intersection New stop, new concrete pad and sign post in between of the curb and sidewalk, new concrete sidewalk Construction started September 2024
Hwy 7 After Upper Governor St (8930) 1977 Hwy 7 Northwest side of Hwy 7 abutting Civic 1977 New concrete bus pad, connection to multi-use path Construction started September 2024
Hwy 7 At Civic 1799 (8931) 1799 Hwy 7 West side of Hwy 7 abutting Civic 1799 Relocation, new concrete bus pad, connection to multi-use path Construction started September 2024
Hwy 7 Before Glasgow Rd (2341) 1905 Hwy 7 North side of Hwy 7 abutting Civic 1905 New stop with new concrete pad Construction started September 2024
Hwy 7 Before Lower Governor St (8768) 1 Lower Governor St Southeast side of Hwy 7 adjacent Civic 1 Lower Governor St Slight relocation of stop, installation of a concrete pad and new sign Construction started September 2024
Main St After Cherry Brook Rd (6942) 10 Cherry Brook Rd North side of Main St abutting Civic 10 Cherry Brook Rd New shelter Completed August 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Hudson Way Before Baffin Blvd (6083) Near the intersection of Hudson Way and Baffin Blvd North side of Hudson Way New concrete pad, upgrading accessibility Pending 2025 construction
Lancaster Dr After Sea King Dr (2323) Opposite to 4 Cannon Terr West side of Lancaster Dr New bus stop, new concrete pad Completed August 2024
Micmac Blvd Before Horizon Ct (7211) 35 Micmac Blvd North side of Micmac Blvd near Civic 35 New concrete pad and sidewalk from the bus pad to the pedestrian ramp at the Micmac Blvd and Horizon Crt intersection Completed November 2024
Pleasant St Before Prince Arthur Ave (9007) 205 Pleasant St East side of Pleasant St abutting Civic 205 Shelter replacement Completed March 2024
Pleasant St Before Southdale St (7485) 181 Pleasant St East side of Pleasant St abutting Civic 181 Shelter replacement Completed March 2024
Portland St After Gaston Rd (8038) 2 Nicole Ct East side of Portland St adjacent Civic 2 Nicole Ct Shelter replacement Completed March 2024
Princess Margaret Blvd After Hudson Way (8070) 30 Iroquois Dr South side of Princess Margarets Blvd near Civic 30 Iroquios Dr New and extended concrete pad between curb and sidewalk Completed November 2024
Princess Margaret Blvd After Windmill Rd (8075) 463 Windmill Rd North side of Princess Margaret Blvd abutting Civic 463 Windmill Rd New concrete pad with connected sidewalk from bus pad to the pedestrian ramp Pending 2025 construction
Princess Margaret Blvd At Civic 40 (8071) 40 Princess Margaret Blvd West side of Princess Margaret Blvd adjacent to Civic 40 New concrete pad Pending 2025 construction
Thistle St After Beech St (8383) 74 Thistle St Southeast side of Thistle St abutting Civic 74 New concrete pad Pending 2025 construction
Thistle St After Crichton Park Rd (8384) 2 Forest Rd North side of Thistle St near Civic 2 Forest Rd Upgrading bus pad length Pending 2025 construction
Thistle St After Mayflower St (8386) 98 Thistle St South side of Thistle St abutting Civic 98 New concrete pad that makes it accessible Pending 2025 construction
Thistle St Before Crichton Park Rd (8391) 3 Crichton Park Rd West side of Crichton Park Rd near Civic 3 New concrete pad and sidewalk Pending 2025 construction
Thistle St Before Mayflower St (8388) 97 Thistle St North side of Thistle St abutting Civic 97 New and slightly larger concrete pad Pending 2025 construction
Thistle St Before Victoria Rd (8393) 85 Victoria Rd South side of the Thistle St adjacent to Bicentennial School Slight relocation of the stop and installation of concrete bus pad Pending 2025 construction
Thistle St opposite Beech St (8390) Opposite to 28 Beech St North side of the Thistle St opposite to 28 Beech St Slight relocation of the stop and installation of concrete bus pad Pending 2025 construction
Princess Margaret Blvd At Civic 55 (8072) 55 Princess Margaret Blvd West side of Princess Margaret Blvd adjacent to Civic 55 New concrete pad Pending 2025 construction
Princess Margaret Blvd Before Hudson Way (2332) 471 Princess Margaret Blvd North side of Princess Margaret Blvd abutting Civic 471 New stop, new concrete pad and sidewalk to the nearest intersection, replacing stops Princess Margaret Blvd Before Hudson Way (8076) and Princess Margaret Blvd Opposite Iroquois Dr (8077) Completed November 2024
Princess Margaret Blvd Before Hudson Way (8076) 465 Princess Margaret Blvd North side of Princess Margaret Blvd abutting Civic 465 Removing the stop, consolidating Princess Margaret Blvd Before Hudson Way (8076) and Princess Margaret Blvd Opposite Iroquois Dr (8077) at new stop Princess Margaret Blvd Before Hudson Way (2332) Stop is closed permanently
Princess Margaret Blvd Before Windmill Rd (8078) 461 Windmill Rd South side of Princess Margaret Blvd abutting Civic 461 Windmill Rd New concrete pad, upgrading accessibility Pending 2025 construction
Princess Margaret Blvd Opposite Iroquois Dr (8077) 471 Princess Margaret Blvd North side of Princess Margaret Blvd abutting Civic 471 Removing the stop, consolidating Princess Margaret Blvd Before Hudson Way (8076) and Princess Margaret Blvd Opposite Iroquois Dr (8077) at new stop Princess Margaret Blvd Before Hudson Way (2332) Stop is closed permanently
Sea King Dr After Ernest Ave (8264) 2 Sea King Dr South side of Sea King Dr abutting Civic 2 Sea King Dr Relocation of stop towards Ernest Ave, installation of landing pad and sidewalk Completed June 2024
Sea King Dr After Lancaster Dr (8263) 35 Sea King Dr North Side of Sea King Dr adjacent to Civic 35 Sea King Dr Installation of concrete pad between curb and sidewalk Completed June 2024
Sea King Dr Before Ernest Ave (8266) 1 Sea King Dr North side of Sea King Dr abutting Civic 1 Sea King Dr Installation of concrete pad between curb and sidewalk Completed June 2024
Sea King Dr Before Lancaster Dr (8265) 34 Sea King Dr South side of Lancaster Dr abutting Civic 34 Sea King Dr Removal of the bus stop, replaced by Stop Lancaster Dr After Sea King Dr (2323) Completed June 2024
Victoria Rd After Boland Rd (8419) 169 Victoria Rd South side of Victoria Rd abutting Civic 169 Shelter replacement Completed March 2024
Windmill Rd Opposite Pelzant St (8542) Opposite to 150 Windmill Rd West side of Windmill Rd opposite to Civic 150 adjacent DND Shelter replacement Competed September 2024
Windmill Rd Opposite Wallace St (8546) 269 Windmill Rd West side of Windmill Rd abutting Civic 269 Shelter replacement Completed August 2024
Woodland Ave After Slayter St (2306) 18 Woodland Ave East side of Woodland Ave abutting Civic 18 New bus stop with new concrete pad between curb and sidewalk, replacing bus stop Woodland Ave Before Slayter St (8587) Completed August 2024
Woodland Ave Before Slayter St (2305) 21 Woodland Ave West side of Woodland Ave abutting Civic 21 New bus stop with new concrete pad between curb and sidewalk, replacing bus stop Woodland Ave After Slayter St (8585) Completed August 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Akerley Blvd After Burnside Dr (6000) 140 Akerley Blvd South side of Akerley Blvd near Don Bayer Sports Field Sidewalk connection to the existing bus pad to upgrade the accessibility of the bus stop Completed November 2024
Albro Lake Rd Before Cedar Ct (6023) 174 Albro Lake Rd South Side of Albro Lake Rd abutting Civic 174 New concrete pad, curb, and sidewalk repairs Completed June 2024
Albro Lake Rd Before Chapman St (6020) 81 Albro Lake Rd North side of Albro Lake Rd adjacent Civic 85 Slight relocation, new concrete pad between curb, and sidewalk repairs Pending 2025 construction
Albro Lake Rd After Cedar Ct (6017) 180 Albro Lake Rd North side of Albro Lake Rd opposite Civic 180 New concrete pad, curb and sidewalk repairs Completed June 2024
Appian Way Before Colonna Pl (2201) 67 Colonna Pl South side of Appian Way abutting Civic 67 Colonna Pl New concrete pad and sidewalk connection to Colonna Pl intersection Completed September 2024
Braemar Dr Before Creelman Dr (6312) 177 Braemar Dr West side of Braemar Dr adjacent Lake Micmac New concrete shelter pad Completed August 2024
Belle Vista Dr After Spring Ave (6294) 73 Bell Vista Dr South side of Bell Vista Dr abutting Civic 73 New concrete pad and new connecting sidewalk Completed November 2024
Commodore Dr After Countryview Dr (8853) 9 Commodore Dr North side of Commodore Dr abutting Civic 9 New shelter Completed October 2024
Countryview Dr Before Shubie Dr (6797) 32 Foulis Row East side of Countryview Dr adjacent Civic 32 Foulis Row New shelter Completed July 2024
Cutler Ave Before Civic 680 (2296) 680 Cutler Ave West side of Cutler Ave before Civic 680 New shelter Completed May 2024
Ilsley Ave At Civic 121 (6958) 121 Ilsley Ave East side of Ilsley Ave abutting Civic 121 New concrete pad and new sidewalk Completed November 2024
Ilsley Ave Before MacDonald Ave (6959) 133 Ilsley Ave East side of Ilsley Ave abutting Civic 133 New concrete pad and new sidewalk Completed November 2024
Ilsley Ave Opposite Halifax Transit (6949) 133 Ilsley Ave East side of Ilsley Ave abutting Civic 133 New concrete pad and new sidewalk Completed November 2024
Leaman Dr Before Ambercrest Pl (2251) 24 Leaman Dr East side of Leaman Drive between Civic 24 and Ambercrest Pl New concrete pad and sidewalk connection to Ambercrest Pl intersection Completed August 2024
Pinecrest Dr After Brule St (7451) 135 Pinecrest Dr North side of Pinecrest Dr opposite to REC New concrete pad and sidewalk repairs Completed November 2024
Pinecrest Dr At Civic 103 (7452) 103 Pinecrest Dr South side of Pinecrest Dr abutting Civic 103 New concrete pad and sidewalk repairs Completed November 2024
Pinecrest Dr At Civic 112 (2329) 112 Pinecrest Dr North side of Pinecrest Dr abutting Civic 112 New stop, new concrete pad and sidewalk repairs, replacing stop Pinecrest Dr At Civic 122 (7454) and Pinecrest Dr Before Civic 108 (7453) Completed November 2024
Pinecrest Dr At Civic 122 (7454) 122 Pinecrest Dr North side of Pinecrest Dr abutting Civic 122 Removing the stop, consolidating Pinecrest Dr At Civic 122 (7454) and Pinecrest Dr Before Civic 108 (7453), new stop Pinecrest Dr At Civic 112 (2329) Completed November 2024
Pinecrest Dr At Civic 123 (7455) 123 Pinecrest Dr South side of Pinecrest Dr abutting Civic 123 New concrete pad and sidewalk repairs Completed November 2024
Pinecrest Dr Before Civic 108 (7453) 108 Pinecrest Dr North side of Pinecrest Dr abutting Civic 112 Removing the stop, consolidating Pinecrest Dr At Civic 122 (7454) and Pinecrest Dr Before Civic 108 (7453), new stop Pinecrest Dr At Civic 112 (2329) with new concrete pad between the curb and sidewalk Completed November 2024
Ronald Smith Ave After Ilsley Ave (8241) 121 Ilsley Ave South side of Ronald Smith Ave adjacent Civic 121 Ilsley Ave New concrete pad, sidewalk repairs Completed July 2024
Windmill Rd After Akerley Blvd (8533) 743 Windmill Rd South side of Windmill Rd adjacent Civic 743 New concrete shelter pad and shelter Completed March 2024
Windmill Rd Before Dawn Dr (8522) 696 Windmill Rd North side of Windmill Rd abutting Civic 696 Shelter replacement Completed January 2024
Woodlawn Rd After Mt Edward Rd (8590) 54 Woodlawn Rd Northwest side of Woodlawn Rd abutting Civic 54 Slight relocation, new concrete pad between curb and sidewalk, removal of old concrete and reinstatement of sod Completed August 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Barrington St After Cogswell St Bay 3 (6105) 1990 Barrington St East side of Barrington St Concrete bus pad, sidewalk replacement, new bus shelters Construction started June 2024
Barrington St After Duke St Bay 1 (6087) 1903 Barrington St West side of Barrington St Concrete bus pad, sidewalk replacement, new bus shelters Construction started June 2024
Barrington St At Scotia Square Bay 4 (6108) 1930 Barrington St East side of Barrington St Concrete bus pad, sidewalk replacement, new bus shelters Construction started June 2024
Barrington St Before Cogswell Bay 2 (2348) 1903 Barrington St West side of Barrington St Concrete bus pad, sidewalk replacement, new bus shelters Construction started June 2024
Barrington St Before Duke St Bay 5 (6107) 5201 Duke St East side of Barrington St Concrete bus pad, sidewalk replacement, new bus shelters Construction started June 2024
Bell Rd After Robie St (6291) 1840 Bell Rd South side of Bell Rd Slight relocation of bus stop and concrete bus pad extension Construction started July 2024
Inglis St At SMU (6965) 5932 Inglis St South side of Inglis St near SMU Extension of concrete bus pad and shelter pad Construction started September 2024
Inglis St Before Robie St (2322) 5985 Inglis St North side of Inglis St near the playground New bus stop on bumpout, concrete landing pad with tactile directional plates and braille and raised text signage, bus shelter installation Completed November 2024
Inglis St Before Robie St (6966) Inglis St Elementary School North side of Inglis St near the elementary school Removal of stop and concrete pad, consolidation of stops Inglis St Before Robie St (6966) and Inglis St Opposite SMU (6960) and relocation at the location of work Stop is permanently closed
Inglis St Opposite SMU (6960) 5915 Inglis St North side of Inglis St near Civic 5915 Removal of stop and concrete pad, consolidation of stops Inglis St Before Robie St (6966) and Inglis St Opposite SMU (6960) Stop is permanently closed
Robie St Opposite Binney St (8219) 1600 Summer St East side of Robie Street near the cemetery Slight relocation, new concrete pad between curb and sidewalk Construction completed October 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Barrington St After Nora Bernard St (6125) 2170 Barrington St West side of Barrington St Removal of stop due to reconfiguration of Barrington St Complete October 2024
Barrington St After Roundabout (2344) 2242 Barrington St East side of Barrington St New stop, new concrete pad Completed November 2024
Barrington St After Upper Water St (2347) 2089 Upper Water St North side of street New stop, new concrete pad Construction started October 2024
Barrington St Before Nora Bernard St (6104) 5221 Barrington St West side of Barrington St Relocation of stop, new concrete bus pad Construction started October 2024
Barrington St Before Roundabout (2345) 2202 Upper Water St East side of Upper Water St New stop, new concrete pad Completed October 2024
Barrington St Before Upper Water St (2346) 2021 Brunswick St West side of Barrington St New stop, new concrete pad Construction started October 2024
Duffus St After Novalea Dr (6583) 5521/5515 Duffus St North side of Duffus St abutting Civic 5521/5515 Shelter replacement Completed October 2024
Quinpool Rd Before Windsor St (8261) 6067 Quinpool Rd North side of Quinpool Rd adjacent to the playground Installation of larger shelter Completed July 2024
Robie St Before Cabot St (8203) 3468 Robie St Southwest side of Robie St abutting Civic 3468 Shelter replacement Completed October 2024
Windsor St After Connaught Ave (8551) 3628 Windsor St South side of Windsor St abutting Civic 3628 Concrete pad extension Construction starting December 2024
Windsor St Before Maxwell Ave (8565) 3380 Windsor St South side of Windsor St abutting Civic 3380 Slight relocation, new concrete pad between curb and sidewalk Construction starting December 2024
Windsor St Opposite London St (8572) 2901 Windsor St Northeast side of Windsor St abutting Civic 2901 Shelter replacement Completed October 2024
Young St After Monaghan Dr (8629) 6141 Young St Northwest side of Young St abutting Civic 6141 Shelter replacement Completed July 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Desmond Ave After Bayers Rd (6563) Opposite 3366 Desmond Ave East side of Desmond Ave before bus stop Desmond Ave After Bayers Rd (6563) Extension of concrete bus pad Completed November 2024
Herring Cove Rd Before Melwood Ave (6900) 1065 Purcells Cove Rd Southeast side of Herring Cove Rd south of Melwood Ave Shelter replacement Completed March 2024
Joseph Howe Dr After Scot St (2325) 3601 Joseph Howe Dr East side of Joseph Howe Dr near the Superstore New concrete pad between curb and sidewalk, new shelter pad and shelter behind sidewalk Pending 2025 construction
Joseph Howe Dr Before Abbott Dr (6979) Opposite and North of 7165 Abbott Dr West side of Joseph Howe Dr south of Hwy 102 overpass New concrete shelter pad and shelter behind sidewalk Pending 2025 construction
Mumford Rd Opposite Hemlock St (7279) Opposite 7083 Mumford Rd South side of Mumford Rd abutting cemetery Shelter replacement Completed March 2024
Oxford St Before Berlin St (7405) 2733 and 2745 Oxford St East side of Oxford St in between Civics 2733 and 2745 New concrete pad between curb and sidewalk Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bedford Hwy After Torrington Dr (6279) 2 Torrington Dr South side of Bedford Hwy adjacent Civic 2 Torrington Dr Shelter replacement Completed 2024
Rosedale Ave After Alex St (8249) 61 Rosedale Ave North side of Rosedale Ave near Civic 61 Slight relocation with new bus pad Complete August 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Greystone Dr After Cobalt Walk (6798) 160 Lavender Walk At the cul-de-sac of the Greystone Dr near Civic 160 Lavender Walk New concrete pad between curb and sidewalk Completed August 2024
Purcells Cove Rd After Dingle Rd (8118) 1452 Purcells Cove Rd East side of Purcells Cove Rd abutting Civic 1452 Shelter replacement Completed August 2024
Purcells Cove Rd After Sailboat Ln (8122) Opposite 1255 Purcells Cove Rd North side of Purcells Cove Rd near Reserve Rd Shelter replacement Completed September 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Chain Lake Dr At Civic 209 (6394) 209 Chain Lake Dr West side of Chain Lake Dr abutting Civic 209 Concrete pad extension Completed October 2024
Julius Blvd Before Dugger McNeil Dr (2315) 125 Julius Blvd South side of Julius Blvd adjacent Civic 125 New bus stop, new concrete pad between curb and sidewalk Completed October 2024
Julius Blvd Before Dugger McNeil Dr (2317) 82 Julius Blvd North side of Julius Blvd adjacent Civic 85 New bus stop, new concrete pad between curb and multi-use path Completed October 2024
Maplewood Dr Before St Margarets Bay Rd (7180) 10 Maplewood Dr South side of Maplewood Dr after the trail Slight relocation of bus stop with new concrete pad Construction started September 2024
St Margarets Bay Rd After Clearwater Dr (6175) 1 Devonshire Dr North Side of St Margarets Bay Rd after Devonshire Dr and St Margarets Bay Rd intersection New concrete pad and pedestrian ramp to intersection Completed October 2024
St Margarets Bay Rd After Raines Mill Rd (2328) 2 Raines Mill Rd North side of St Margarets Bay Rd abutting Civic 2 Raines Mill Rd New bus stop with new concrete pad between curb and sidewalk, replacing bus stop St Margarets Bay Rd Before Raines Mill Rd (6180) Construction started December 2024
St Margarets Bay Rd at civic 1917 (2330) 1917 St Margarets Bay Rd North side of St Margarets Bay Rd abutting Civic 1917 New bus stop with new concrete pad between the curb and the sidewalk, replacing bus stop St Margarets Bay Rd At Civic 1939 (6149) Pending 2025 construction
St Margarets Bay Rd At Civic 1922 (6170) 1928 St Margarets Bay Rd South side of St Margarets Bay road near Civic 1928 New concrete pad between curb and sidewalk Pending 2024 construction
St Margarets Bay Rd At Civic 1939 (6149) 1939 St Margarets Bay Rd North side of St Margarets Bay Rd near Civic 1917 Removal of bus stop, new location of bus stop to further east side of St Margarets Bay Rd at Civic 1917 (2330) Stop is permanently closed
St Margarets Bay Rd Before Raines Mill Rd (6180) 1403 Lakeside Dr North side of St Margarets Bay Rd near Civic 1403 Lakeside Dr Removal of bus stop, new location of bus stop at St Margarets Bay Rd After Raines Mill Rd (2328) Stop is permanently closed
St Margarets Bay Rd Before Sheppards Run (6157) 438 Sheppards Run South side of St Margarets Bay Rd adjacent Civic 438 Sheppards Run Shelter replacement Completed October 2024
St Margarets Bay Rd Opposite Boylan Ln (6164) 1370 St Margarets Bay Rd South side of St Margarets Bay Rd abutting Civic 1370 New concrete bus pad and new sidewalk from Raines Mill Rd to Oliver St, connecting shelter pad to an accessible pedestrian route Construction started October 2024
Susie Lake Cr Before Julius Blvd (2313) 420 Susie Lake Cr North side of Susie Lake Cr opposite Civic 420 New concrete pad between curb and sidewalk, concrete shelter pad, and shelter Completed March 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Beaver Bank Rd After Welkin Dr (8755) 352 Beaver Bank Rd West side of Beaver Bank Rd opposite Civic 345 New signpost, concrete pad, and sidewalk connection to intersection at Welkin Dr Completed 2024
Beaver Bank Rd Before Welkin Dr (8713) 343 Beaver Bank Rd East side of Beaver Bank Rd near Civic 343 Relocation bus stop forward ~10m, concrete pad increase, installation of signpost Completed May 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Cobequid Rd After Freer Ln (6434) 191 Cobequid Rd East side of Cobequid Rd near Civic 191 New shelter pad Completed December 2023
Cobequid Rd After Maple Grove Dr (6431) 450 Cobequid Rd West side of Cobequid Rd near Civic 450 New shelter pad Started December 2024
Cobequid Rd Before Maple Grove Dr (6441) 473 Cobequid Rd East side of Cobequid Rd near Civic 477 Relocation of the stop to Civic 477, stop will be closed permanently in February Started December 2024
Cobequid Rd After Maple Grove Dr (2349) 477 Cobequid Rd East side of Cobequid Rd near Civic 478 New concrete pad between curb and sidewalk Started December 2024
First Lake Dr After Civic 192 (6683) 192 First Lake Dr North side of First Lake Dr near Civic 192 New sidewalk connection to the concrete pad Completed July 2024
Sackville Dr Before Armoyan Dr (7313) 300 Sackville Dr West side of Sackville Dr abutting Civic 300 Shelter replacement Completed October 2024
Sackville Terminal Bay 4 (8960) Sackville Terminal Sackville Terminal Shelter replacement Completed October 2024
Stokil Dr After Grennan Dr (8354) 86 Grennan Dr West side of Stokil Dr near Civic 86 Grennan Dr Concrete pad replacement Completed September 2024
Stokil Dr After Grennan Dr (8356) 253 Stokil Dr East side of Stokil Dr near Civic 1 Armcrest Dr Slight relocation to Civic 1 Armcrest Dr, new concrete Pad between curb and sidewalk Completed September 2024
Stokil Dr After Sampson Dr (8355) 2 Sampson Dr North side of Stokil Dr near Civic 2 Sampson Dr Concrete pad replacement Completed September 2024
Stokil Dr Before Smokey Dr (8358) 241 Smokey Dr West side of Stokil Dr adjacent to elementary school Concrete pad replacement Completed September 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bedford Hwy After Charlotte Ln (6287) 587 Bedford Hwy East side of Bedford Hwy near Civic 587 New concrete bus pad, new shelter with shelter pad, sidewalk connection to Charlotte Ln intersection Pending 2025 construction
Bedford Hwy After Shaunslieve Dr (6234) 34 Shaunslieve Dr West side of Bedford Hwy near Civic 34 Shaunslieve Dr New concrete bus pad, shelter replacement, sidewalk connection to Shaunslieve Dr intersection Pending 2025 construction
Bedford Hwy Before Spring St (6249) 1326 Bedford Hwy Northwest side of Bedford Hwy abutting Civic 1326 Shelter replacement Completed July 2024
Bedford Hwy Before Union St (6228) 1488 Bedford Hwy North side of Bedford Hwy abutting Civic 1488 Shelter replacement Completed January 2024
Broad St Before Larry Uteck Blvd (2027) 51 Jam Ln North side of Broad St adjacent Civic 51 Jam Ln New concrete shelter pad and shelter Construction starting November 2024
Larry Uteck Blvd After Kearney Lake Rd (6298) 1000 Larry Uteck Blvd South side of Larry Uteck Blvd abutting Civic 1000 New concrete bus pad, shelter, sidewalk connection, and RA-5 crosswalk Completed January 2024
Larry Uteck Blvd Before Abbington Ave (7022) 29 Abbington Ave Northeast side of Larry Uteck Blvd adjacent Civic 29 Abbington Ave New bus pad, sidewalk connection, and RA-5 crosswalk Completed August 2024
Larry Uteck Blvd Before Belle St (7027) 3 Belle St Southwest side of Larry Uteck Blvd adjacent Civic 3 Belle St New bus pad, sidewalk connection, and RA-5 crosswalk Completed August 2024