A new concrete plaza style skate park is coming to Eastern Passage Common Park.
The image shown above represents the preferred design direction, which was developed through user group focused design workshops and online surveys that took place November 2023 through January 2024.
Detailed design drawings and construction specifications are currently being developed. Construction is expected to begin in May 2024, and will take approximately 8 – 12 weeks.
The proposed Eastern Passage Common Park plan was approved by Regional Council on February 25, 2020.