St. Margaret's Bay Rails to Trails

Facilities

  • parking lot
  • benches
  • picnic tables

Designated uses

  • walking
  • hiking
  • biking
  • Nordic walking
  • cross country skiing
  • all-terrain vehicles (ATVs)
  • bird watching 
  • snowshoeing

Features

  • wheelchair accessible 
  • rail trail
  • cell phone service
  • kilometre markers

Map

Other information about the trail

Length of trail: 32 kilometres 
Time to complete: 2 days
Trailhead location: There are 3 trailheads. The first is located at the western end of the trails, on Station Road in Hubbards. The 2nd, at the Head of St. Margaret's Bay on Station Road. The 3rd, at the eastern end on Highway 3 at Hubley.
Linear or loop trail: linear 
Surface: crusher dust 
Other trails adjacent: adjacent to Beechville/Lakeside/Timberlea Trail and, on the western end, to Chester Connector Trail.