Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Hwy 7 Before Circle Dr (8918) 3293 Hwy 7 North side of Hwy 7 abutting Civic 3293 Widen gravel shoulder, new asphalt pad. Pending 2024 construction
Hwy 7 Before Martin Lake Dr (8920) 3103 Hwy 7 West side of Hwy 7 abutting Civic 3103 Widen gravel shoulder, new asphalt pad. Pending 2024 construction
Brooks Dr At East Preston Rec Centre (8929) 24 Brooks Dr West side of Brooks Dr abutting Civic 24 Slight relocation - New connection to multi-use path. Pending 2024 construction
Brooks Dr At East Preston Rec Centre (8929) 24 Brooks Dr. South side of Brooks Dr near East Preston Recreation Centre Relocation of stop and installation of new concrete pad. Pending 2024 construction
Brooks Dr Opposite East Preston Rec Centre (8769) 11 Brooks Dr East side of Brooks Dr abutting Civic 11 Slight relocation - New pad. Pending 2024 construction
Brooks Dr Opposite East Preston Rec Centre (8769) Near 11 Brooks Dr South side of Brooks Dr near Civic 11 Slight relocation and new concrete pad installation. Pending 2024 construction
Hwy 7 After Civic 1776 (8767) 1776 Hwy 7 East side of Hwy 7 abutting Civic 1776 Slight relocation - New pad. Pending 2024 construction
Hwy 7 After Civic 1776 (8767) No abutting Civic address North side of Hwy 7 opposite to Civic 1799 Relocation of stop, installing a concrete pad and new sign. Pending 2024 construction
Hwy 7 After Upper Governor St (8930) 1977 Hwy 7 Northwest side of Hwy 7 abutting Civic 1977 New pad, new connection to multi-use path. Pending 2024 construction
Hwy 7 After Upper Governor St (8930) 1967 Nova Scotia Trunk 7 Southwest side of Hwy 7 opposite to Civic 1901 Installing new concrete pad and sign. Pending 2024 construction
Hwy 7 At Civic 1799 (8931) 1799 Hwy 7 West side of Hwy 7 abutting Civic 1799 Slight relocation - New connection to multi-use path. Pending 2024 construction
Hwy 7 At Civic 1799 (8931) 1799 Hwy 7, East Preston Northside of Hwy 7 near Civic 1799 Slight relocation of stop, intalling new concrete pad and sign. Pending 2024 construction
Hwy 7 Before Lower Governor St (8768) 1 Lower Governor St Southeast side of Hwy 7 adjacent 1 Lower Governor St Slight relocation of stop, installing a concrete pad and new sign. Pending 2024 construction
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address(es) Location of Work Scope of Work Status
Belle Vista Dr After Spring Ave (6294) 73 Belle Vista Dr East side of Belle Vista Dr near Civic 73 New concrete pad between curb and sidewalk. Pending 2024 construction
Caldwell Rd After Birchill Dr (2218) 1720 Birchill Dr North east side of Caldwell Rd abutting Civic 1720. Concrete landing pad and sidewalk connection to Birchill Dr. Pending 2024 construction
Caldwell Rd after Cow Bay Rd (6333) Opposite to 1804 Caldwell Rd South side of Caldwell Rd near the cemetery Upgrading shelter pad Pending 2024 construction
Caldwell Rd After Himmelman Dr (6334) 49 Sidney Cr South side of Caldwell Rd after Himmelman Dr abutting 49 Sidney Cr Upgrading Bus pad length Pending 2024 construction
Caldwell Rd After Thorncrest Ct (6337) 1881 Caldwell Rd Southeast side of Caldwell Rd near the Elementary School Upgrading shelter pad Pending 2024 construction
Caldwell Rd Before Deyoung Dr (2220) 1622 Caldwell Rd North east side of Caldwell Rd abutting Civic 1622. Concrete landing pad and sidewalk connection to Deyoung Dr. Pending 2024 construction
Caldwell Rd Before Seabreeze Dr (6340) 1909 Caldwell Rd Southeast side of Caldwell Rd near the Senior manor Upgrading shelter pad Pending 2024 construction
Caldwell Rd Opposite Kaleigh Dr (2219) 1682 Caldwell Rd North east side of Caldwell Rd abutting Civic 1682. Concrete landing pad with sidewalk connection to Kaleigh Dr. Pending 2024 construction
Collins Grv After Spring Ave (2267) 103 Collins Grv South side of Collins Grv adjacent 103 Collins Grove Rg New concrete pad between curb and sidewalk. June 2024 construction
Collins Grv At Civic 83 (2268) 83 Collins Grv West side of Collins Grv abutting Civic 83 New concrete pad between curb and sidewalk. June 2024 construction
Collins Grv Before Collins Grove Rg (2269) 1 Collins Grove Rg South side of Collins Grv adjacent 1 Collins Grove Rg New concrete pad between curb and sidewalk. June 2024 construction
Cow Bay Rd Before Caldwell Rd (8674) 386 Cow Bay Rd North west side of Cow Bay Rd abutting Civic 386 Concrete landing pad and sidewalk connection to Caldwell Rd intersection. Pending 2024 construction
Heritage Hills Dr Before Cow Bay Rd (8673) 4 Heritage Hills Dr North east side of Heritage Hills Dr abutting Civic 4 Concrete landing pad and sidewalk connection to Cow Bay Rd. Pending 2024 construction
Heritage Hills Dr Before Serop Cr (8672) 1 Serop Cr North east side of Heritage Hills Dr adjacent 1 Serop Cr Concrete landing pad and sidewalk connection to Serop Cr. Pending 2024 construction
Main Rd Before Bonaventure St (7486) No abutting Civic address Northwest side of Main Rd near Bonaventure St Shelter replacement. Completed January 2024
Portland Hills Terminal Bay 2 (8950) No abutting Civic address Portland Hills Terminal Shelter replacement. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Circassion Dr After Ellerslie Cr (2307) 62 Circassion Cr East side of Circassion Dr abutting Civic 62 Relocation of bus stop Circassion Dr Before Ellerslie (6425) after Ellerslie Cr. New concrete pad between curb and sidewalk. June 2024 construction
Cole Harbour Rd Before Dorothea Dr (6481) 907 Cole Harbour Rd North side of Cole Harbour Rd opposite Civic 912 Shelter replacement. Starting May 2024 Construction
Forest Hills Pky At Cole Harbour Place (6669) 51 Forest Hills Pky East side of Forest Hills Pky abutting Civic 51 New shelter. Completed March 2024
Gregory Dr After Flying Cloud Dr (6792) 7 Gregory Dr North side of Gregory Dr abutting Gregory Dr Park Relocation of Bus stop on Flying Cloud Dr at Civic 204. New concrete pad and removal of old pad. Starting May 2024 Construction
Gregory Dr Before Wildwood Blvd (6794) Opposite to 14 Gregory Dr West side of Gregory Dr opposite to Civic 14 New concrete pad and sidewalk and new shelter pad. Starting May 2024 Construction
Main St After Cherry Brook Rd (6942) 10 Cherry Brook Rd North side of Main St abutting Civic 10 New shelter. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Micmac Blvd Before Horizon Ct (7211) 35 Micmac Blvd West side of Mic Mac Blvd near Civic 35 New concrete pad and sidewalk from the bus pad to the pedestrian ramp at the Mic Mac Blvd and Horizon Crt intersection. Pending 2024 construction
Pleasant St Before Prince Arthur Ave (9007) 205 Pleasant St East side of Pleasant St abutting Civic 205 Shelter replacement. Completed March 2024
Pleasant St Before Southdale St (7485) 181 Pleasant St East side of Pleasant St abutting Civic 181 Shelter replacement. Completed March 2024
Portland St After Gaston Rd (8038) 2 Nicole Ct East side of Portland St adjacent 2 Nicole Ct Shelter replacement. Completed March 2024
Sea King Dr After Ernest Ave (8264) 2 Sea King Dr South side of Sea King Dr abutting 2 Sea King Dr Relocation of stop towards Earnest Ave and installation of landing pad and sidewalk. Completed June 2024
Sea King Dr After Lancaster Dr (8263) 35 Sea King Dr North Side of Sea King Dr adjacent to 35 Sea King Dr Installation of concrete pad between curb and sidewalk. Completed June 2024
Sea King Dr Before Ernest Ave (8266) 1 Sea King Dr Norh side of Sea King Dr abutting 1 Sea King Dr Installation of concrete pad between curb and sidewalk. Completed June 2024
Sea King Dr Before Lancaster Dr (8265) 34 Sea King Dr West Side of Lancaster Dr abutting 34 Sea King Dr Removal of the bus stop and relocate at Lancaster Dr. Completed June 2024
Thistle St After Beech St (8383) 74 Thistle St Northeast side of Thistle St abutting Civic 74 New concrete pad. Pending 2024 construction
Thistle St After Crichton Park Rd (8384) 2 Forest Rd East side of Thistle St near 2 Forest Rd Upgrading bus pad length Pending 2024 construction
Thistle St After Mayflower St (8386) 98 Thistle St Northeast side of Thistle St abutting Civic 98 New concrete pad that makes it accessible. Pending 2024 construction
Thistle St Before Crichton Park Rd (8391) 3 Crichton Park Rd West side of Crichton Park Rd near Civic 3 New concrete pad and sidewalk. Pending 2024 construction
Thistle St Before Mayflower St (8388) 97 Thistle St Southwest side of Thistle St abutting Civic 97 New and slightly larger concrete pad. Pending 2024 construction
Thistle St Before Victoria Rd (8393) 85 Victoria Rd Southwest side of the Thistle St adjacent to Bicentennial School Slight relocation of the stop and installation of concrete bus pad. Pending 2024 construction
Thistle St opposite Beech St (8390) Opposite to 28 Beech St Southwest side of the Thistle St opposite to 28 Beech st Slight relocation of the stop and installation of concrete bus pad. Pending 2024 construction
Victoria Rd After Boland Rd (8419) 169 Victoria Rd South side of Victoria Rd abutting Civic 169 Shelter replacement. Completed March 2024
Windmill Rd Opposite Pelzant St (8542) Opposite to 150 Windmill Rd West side of Windmill Rd opposite to 150 Windmill Rd adjacent DND Shelter replacement. Pending 2024 construction
Windmill Rd Opposite Wallace St (8546) 269 Windmill Rd West side of Windmill Rd abutting Civic 269 Shelter replacement. Pending 2024 construction
Woodland Ave After Slayter St (2306) 18 Woodland Ave East side of Woodland Ave abutting Civic 18 Relocation of bus stop Woodland Ave Before Slayter St (8587). Concrete pad between curb and sidewalk. Pending 2024 construction
Woodland Ave Before Slayter St (2305) 19 Woodland Ave West side of Woodland Ave abutting Civic 21 Relocation of bus stop Woodland Ave After Slayter St (8585). Concrete pad between curb and sidewalk. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Appian Way Before Colonna Pl (2201) 67 Colonna Pl Northwest side of Appian Way abutting Civic 67 New concrete pad and sidewalk connection Pending 2024 construction
Braemar Dr Before Creelman Dr (6312) 177 Braemar Dr West side of Braemar Dr adjacent Lake Micmac New concrete shelter pad. Pending 2024 construction
Commodore Dr After Countryview Dr (8853) 9 Commodore Dr North side of Commodore Dr abutting Civic 9. New shelter. Pending 2024 construction
Countryview Dr Before Shubie Dr (6797) 32 Foulis Row East side of Countryview Dr adjacent 32 Foulis Row. New shelter. Pending 2024 construction
Cutler Ave Before Civic 680 (2296) Civic 680 West side of Cutler Ave before Civic 680 New shelter. March 2024 construction
Hudson Way Before Baffin Blvd (6083) No adjacent address West side of Hudson Way opposite Baffin Blvd New concrete pad and sidewalk. New RA-4 crosswalk. Pending 2024 construction
Ilsley Ave At Civic 121 (6958) 121 Ilsley Ave East side of Ilsley Ave abutting Civic 121 New concrete pad and sidewalk. Pending 2024 construction
Ilsley Ave Before MacDonald Ave (6959) 133 Ilsley Ave East side of Ilsley Ave abutting Civic 133 New concrete pad and sidewalk. Pending 2024 construction
Ilsley Ave Opposite Halifax Transit (6949) 133 Ilsley Ave East side of Ilsley Ave abutting Civic 133 New concrete pad and sidewalk. Pending 2024 construction
Leaman Dr Before Ambercrest Pl (2251) 24 Leaman Dr East side of Leaman Drive between Civic 24 and Ambercrest Pl. New concrete pad and sidewalk. Pending 2024 construction
Pinecrest Dr After Brule St (7451) 23 Brule St Northwest side of Pinecrest Dr opposite to REC New concrete pad and sidewalk Pending 2024 construction
Pinecrest Dr At Civic 103 (7452) 103 Pinecrest Dr North of Pinecrest Dr abutting Civic 103 New concrete pad and sidewalk Pending 2024 construction
Pinecrest Dr At Civic 122 (7454) 122 Pinecrest Dr North of Pinecrest Dr abutting Civic 122 New concrete pad and sidewalk Pending 2024 construction
Pinecrest Dr At Civic 123 (7455) 123 Pinecrest Dr North of Pinecrest Dr abutting Civic 123 New concrete pad and sidewalk Pending 2024 construction
Pinecrest Dr At Crystal Dr (7458) 87 Pinecrest Dr Southeast side of Pinecrest Dr Relocation of the stop, new concrete pad Pending 2024 construction
Pinecrest Dr Before Civic 108 (7453) 108 Pinecrest Dr North of Pinecrest Dr abutting Civic 108 New concrete pad and sidewalk Pending 2024 construction
Princess Margaret Blvd After Windmill Rd (8075) 463 Windmill Rd North side of Princess Margaret Blvd abutting 463 Windmill Rd New concrete pad and sidewalk. Pending 2024 construction
Princess Margaret Blvd Before Hudson Way (8076) 465 Princess Margaret Blvd North side of Princess Margaret Blvd abutting Civic 465 New concrete pad and sidewalk. Pending 2024 construction
Princess Margaret Blvd Before Windmill Rd (8078) 461 Windmill Rd South side of Princess Margaret Blvd abutting 461 Windmill Rd New concrete pad between curb and sidewalk. Pending 2024 construction
Ronald Smith Ave After Ilsley Ave (8241) 121 Ilsley Ave South side of Ronald Smith Ave adjacent 121 Ilsley Ave New concrete pad between curb and sidewalk. June 2024 construction
Windmill Rd After Akerley Blvd (8533) 743 Windmill Rd South side of Windmill Rd adjacent Civic 743 New concrete shelter pad and shelter. Completed March 2024
Windmill Rd Before Dawn Dr (8522) 696 Windmill Rd West side of Windmill Rd abutting Civic 696 Shelter replacement. Completed January 2024
Woodlawn Rd After Mt Edward Rd (8590) 54 Woodlawn Rd Northwest side of Woodlawn Rd abutting Civic 54 Slight relocation - new concrete pad between curb and sidewalk. Remove old concrete and reinstate sod. June 2024 construction
Albro Lake Rd Before Chapman St (6020) 81 Albro Lake Rd Southwest side of Albro Lake road adjascent Civic 85 Slight relocation - new concrete pad between curb and sidewalk. Pending 2024 construction
Princess Margaret Blvd After Windmill Rd (8075) 463 Windmiill Rd West side of Princess Margaret Blvd Adjascent to Civic 463 New concrete pad and sidewalk. Pending 2024 construction
Princess Margaret Blvd Before Windmill Rd (8078) 461 Windmill Rd East side of Princess Margaret Bay adjascent to Civic 461 New concrete pad Pending 2024 construction
Princess Margaret Blvd After Hudson Way (8070) 30 Iroquois Dr East side of Princess Margarets bay near Civic 30 New and extended concrete pad between curb and sidewalk. Pending 2024 construction
Princess Margaret Blvd Before Hudson Way (8076) No adjacent address West side of Princess Margaret Blvd near the intersection of Hwy 111 EB New concrete pad and sidewalk upto the Hwy intersection. Pending 2024 construction
Hudson Way Before Baffin Blvd (6083) No adjacent address Hudson way east of Baffin Blvd New concrete pad and curb and pedestrain ramp with tactile plates. Pending 2024 construction
Princess Margaret Blvd At Civic 55 (8072) 55 Princess Margaret Blvd South side of Proncess Margaret Blvd adjascent to Civic 55 New concrete pad. Pending 2024 construction
Princess Margaret Blvd At Civic 40 (8071) 40 Princess Margaret Blvd South side of Proncess Margaret Blvd adjascent to Civic 40 New concrete pad. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Inglis St Before Robie St (6966) Inglis St Elementary School Northwest side of Inglis St near the Elementary School Consolidation of Inglis St Before Robie St (6966) and Inglis St Opposite SMU (6960) and relocate at the location of work. Removal of stop and concrete pad. Pending 2024 construction
Inglis St At SMU (6965) 5932 Inglis street Southeast side of Inglis St near SMU Extension of pad and shelter pad. Pending 2024 construction
Inglis St Before Robie St (2322) 5985 Inglis St Northwest side of Inglis St near the playground New concrete pad between the curb and the sidewalk, new stop. Pending 2024 construction
Inglis St Opposite SMU (6960) 5915 Inglis St Northwest side of Inglis St near Civic 5915 Consolidation of Inglis St Before Robie St (6966) and Inglis St Opposite SMU (6960) and relocate at the location of work. Removal of stop and concrete pad. Pending 2024 construction
Robie St Opposite Binney St (8219) 1600 Summer St North side of Robie street near the cemetary Slight relocation - New concrete pad between curb and sidewalk Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Duffus St After Novalea Dr (6583) 5521/5515 Duffus St North side of Duffus St abutting Civic 5521/5515 Shelter replacement. Pending 2024 construction
Oxford St Before Berlin St (7405) 2733 and 2745 Oxford St East side of Oxford St in between Civics 2733 and 2745 New concrete pad between curb and sidewalk. Pending 2024 construction
Quinpool Rd Before Windsor St (8261) 6067 Quinpool Rd Westside of Quinpool Rd adjascent to the playground. Installing larger shelter. Pending 2024 construction
Robie St Before Cabot St (8203) 3468 Robie St South west side of Robie St abutting Civic 3468 Shelter replacement. Pending 2024 construction
Windsor St After Connaught Ave (8551) 3628 Windsor St South side of Windsor St abutting Civc 3628 Concrete pad extension. Pending 2024 construction
Windsor St Before Maxwell Ave (8565) 3380 Windsor St South side of Windsor St abutting Civc 3380 Slight relocation. New concrete pad between curb and sidewalk. Pending 2024 construction
Windsor St Opposite London St (8572) 2901 Windsor St North west side of Windsor St abutting Civic 2901 Shelter replacement. Pending 2024 construction
Young St After Monaghan Dr (8629) 6141 Young St North west side of Young St abutting Civic 6141 Shelter replacement. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Duffus St After Novalea Dr (6583) 5521/5515 Duffus St North side of Duffus St abutting Civic 5521/5515 Shelter replacement. Pending 2024 construction
Oxford St Before Berlin St (7405) 2733 and 2745 Oxford St East side of Oxford St in between Civics 2733 and 2745 New concrete pad between curb and sidewalk. Pending 2024 construction
Quinpool Rd Before Windsor St (8261) 6067 Quinpool Rd Westside of Quinpool Rd adjascent to the playground. Installing larger shelter. Pending 2024 construction
Robie St Before Cabot St (8203) 3468 Robie St South west side of Robie St abutting Civic 3468 Shelter replacement. Pending 2024 construction
Windsor St After Connaught Ave (8551) 3628 Windsor St South side of Windsor St abutting Civc 3628 Concrete pad extension. Pending 2024 construction
Windsor St Before Maxwell Ave (8565) 3380 Windsor St South side of Windsor St abutting Civc 3380 Slight relocation. New concrete pad between curb and sidewalk. Pending 2024 construction
Windsor St Opposite London St (8572) 2901 Windsor St North west side of Windsor St abutting Civic 2901 Shelter replacement. Pending 2024 construction
Young St After Monaghan Dr (8629) 6141 Young St North west side of Young St abutting Civic 6141 Shelter replacement. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bedford Hwy After Torrington Dr (6279) 2 Torrington Dr South side of Bedford Hwy adjacent 2 Torrington Dr Shelter replacement. Pending 2024 construction
Dutch Village Rd Before Andrew St (6609) 3543 Dutch Village Rd North side of Dutch Village Rd near Civic 3543 New concrete landing pad and sidewalk. Pending 2024 construction
Dutch Village Rd Before Central Ave (6788) 3433 Dutch Village Rd North side of Dutch Village Rd near Civic 3433 New concrete landing pad and sidewalk. Pending 2024 construction
Dutch Village Rd Before Rufus Ave (6614) 3600 Dutch Village Rd South side of Dutch Village Road near Civic 3600 New concrete landing pad and sidewalk. Pending 2024 construction
Kearney Lake Rd After Hamshaw Dr (7021) 209 Kearney Lake Rd Northwest of Kearney Lake Dr near Civic 209 Slight relocation with new bus pad Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Greystone Dr After Cobalt Walk (6798) 160 Lavender Walk At the cul-de-sac of the Greystone Dr near Civic 160 New concrete pad between the curb and sidewalk June 2024 Construction
Greystone Dr Opposite Cranberry Ct (6795) 147 Greystone Dr North side of Greystone Dr near Civic 147 New concrete pad between the curb and sidewalk June 2024 Construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Chain Lake Dr At Civic 209 (6394) 209 Chain Lake Dr West Side of Chain Lake Dr abutting Civic 209 Concrete pad extension. Pending 2024 construction
Julius Blvd After Susie Lake Cr (2314) 265 Julius Blvd Southeast side of Julius Blvd adjacent Civic 265 New concrete pad between curb and sidewalk. Pending 2024 construction
Julius Blvd Before Chain Lake Dr (2316) 201 Chain Lake Dr South side of Julius Blvd abutting 201 Chain Lake Dr New concrete pad between curb and sidewalk. Pending 2024 construction
Julius Blvd Before Dugger McNeil Dr (2315) 125 Julius Blvd South side of Julius Blvd adjacent Civic 125 New concrete pad between curb and sidewalk. Pending 2024 construction
Julius Blvd Before Dugger McNeil Dr (2317) 82 Julius Blvd North side of Julius Blvd adjacent Civic 85 New concrete pad between curb and multi-use path. Pending 2024 construction
Julius Blvd Before Susie Lake Dr (2318) 265 Julius Blvd Northeast side of Julius Blvd opposite Civic 265 New concrete pad between curb and multi-use path. Pending 2024 construction
Maplewood Dr Before St Margarets Bay Rd (7180) 10 Maplewood Dr Eastside of maplewood dr after the trail Slight relocation of the bus stop with new concrete pad. Pending 2024 construction
St Margarets Bay Rd After Clearwater Dr (6175) 1 Devonshire Dr North Side of St Margarets Bay Rd after Devonshire Dr and St Margarets Bay Rd Intersection New concrete pad and pedestrian ramp to intersection. Pending 2024 construction
St Margarets Bay Rd At Civic 1922 (6170) 1928 St Margarets Bay Rd Southeast side of St Margarets Bay road near Civic 1928 New concrete pad between curb and sidewalk. Pending 2024 construction
St Margarets Bay Rd At Civic 1939 (6149) 1939 St Margarets Bay Rd Northwest of St Margarets Bay Rd near Civic 1917 Relocation of the bus stop to further east side of the St Margarets Bay Rd, with new concrete pad. Pending 2024 construction
St Margarets Bay Rd Before Raines Mill Rd (6180) 1403 Lakeside Dr West side of St Margaret's Bay Rd near Civic 1403 Lakeside Dr Relocation of stop at the location of work and install new bus pad adjascent to the sidewalk. Pending 2024 construction
St Margarets Bay Rd Before Raines Mill Rd (6180) 3 Raines Mill Rd Westside of St Margaret's Bay Rd Near Civic 1403 Relocation of the bus stop to further west of the road, with new concrete pad. Pending 2024 construction
St Margarets Bay Rd Before Sheppards Run (6157) 438 Sheppards Run South side of St Margarets Bay Rd adjacent 438 Sheppards Run Shelter replacement. March 2024 construction
St Margarets Bay Rd Opposite Boylan Ln (6164) 1370 St Margaret's Bay Rd East side of the St Margaret's Bay Rd abutting Civic 1370 New concrete bus pad and new sidewalk from Raines Mill Rd to Oliver St, connecting shelter pad to an accessible pedestrian route. Pending 2024 construction
Susie Lake Cr Before Julius Blvd (2313) 420 Susie Lake Cr North side of Susie Lake Cr opposite Civic 420 New concrete pad between curb and sidewalk. New concrete shelter pad and shelter. Completed March 2024
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Beaver Bank Rd After Welkin Dr (8755) 352 Beaver Bank Rd Northside of Beaver Bank Rd opposite to Civic 345 New signpost, concrete pad, and sidewalk connection to intersection of Welkin Dr. Completed 2024
Beaver Bank Rd Before Welkin Dr (8713) 343 Beaver Bank Rd Northside of Beaver Bank Rd near Civic 343 Relocate bus stop forward ~10m. Concrete pad increase and sign post install. May 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Cobequid Rd After Freer Ln (6434) 191 Cobequid Rd Northeast side of Cobequid Rd near Civic 191 New shelter pad Pending 2024 construction
Cobequid Rd After Maple Grove Dr (6431) 450 Cobequid Rd Southwest side of Cobequid Rd near Civic 450 New shelter pad Pending 2024 construction
Cobequid Rd Before Maple Grove Dr (6441) No abutting address Northeast side of Cobequid Rd near Civic 477 Slight relocation - New concrete Pad between curb and sidewalk. Pending 2024 construction
Sackville Dr Before Armoyan Dr (7313) 300 Sackville Dr South side of Sackville Dr abutting 300 Sackville Dr Shelter replacement. Pending 2024 construction
Sackville Terminal Bay 4 (8960) Sackville Terminal Sackville Terminal Shelter replacement. Pending 2024 construction
Stokil Dr After Grennan Dr (8354) No abutting address Southeast of Stokil Dr after Grennan Dr Concrete pad replacement. Pending 2024 construction
Stokil Dr After Grennan Dr (8356) 253 Stokil Dr Stokil Dr before Armcrest Dr near civic 253 Relocation - New concrete Pad between curb and sidewalk. Pending 2024 construction
Stokil Dr After Sampson Dr (8355) No abutting address Southeast side of Stokil Dr after Sampson Dr Concrete pad replacement. Pending 2024 construction
Stokil Dr Before Smokey Dr (8358) No abutting address Southeast side of Stokil Dr adjacent school Concrete pad replacement. Pending 2024 construction
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bus Stop Location Nearest Civic Address Location of Work Scope of Work Status
Bedford Hwy After Nelsons Landing Blvd (6259) 7 Nelsons Landing Blvd North side of Bedford Hwy oppposite 7 Nelsons Landing Blvd New shelter pad and shelter. Pending 2024 construction
Bedford Hwy After Charlotte Ln (6287) 587 Bedford Hwy North side of Bedford Hwy near Civic 587 New Concrete pad with sidewalk connection, new shelter with shelter pad. Pending 2024 construction
Bedford Hwy After Shaunslieve Dr (6234) 34 Shaunslieve Dr South side of Bedford Hwy near Civic 34 New concrete pad. Removal of old shelter pad with new one and new shelter. Pending 2024 construction
Bedford Hwy Before Spring St (6249) 1326 Bedford Hwy Northwest side of Bedford Hwy abutting Civic 1326 Shelter replacement. Pending 2024 construction
Bedford Hwy Before Union St (6228) 1488 Bedford Hwy North side of Bedford Hwy abutting Civic 1488 Shelter replacement. Completed January 2024
Broad St Before Larry Uteck Blvd (2027) 51 Jam Ln North side of Broad St adjacent 51 Jam Ln New concrete shelter pad and shelter. November 2023 construction
Larry Uteck Blvd After Kearney Lake Rd (6298) 1000 Larry Uteck Blvd South side of Larry Uteck Blvd abutting 1000 Larry Uteck Blvd New concrete pad, sidewalk connection, and RA-5 crosswalk. New concrete shelter pad and shelter. Completed January 2024
Larry Uteck Blvd Before Abbington Ave (7022) 29 Abbington Ave Northeast side of Larry Uteck Blvd adjacent 29 Abbington Ave New concrete pad, sidewalk connection, and RA-5 crosswalk. Pending 2024 construction
Larry Uteck Blvd Before Belle St (7027) 3 Belle St Southwest side of Larry Uteck Blvd adjacent 3 Belle St New concrete pad, sidewalk connection, and RA-5 crosswalk. Pending 2024 construction